From order to delivery
Fully transparent and trackable
Five-stage standardized production process with real-time progress updates at each stage.
Since 2003, Ding Xiao Liang has been responsible for bringing Mercedes-Benz motorhomes to China,深耕ing the RV sector for over two decades with extensive manufacturing experience and a robust quality control system.
Configure → Schedule Production → Quality Inspection → Logistics & Shipping → Doorstep Delivery
Real-time Production Dashboard
In-production order statistics by stage
Quality Assurance
End-to-end quality control: every vehicle undergoes 200+ inspections before leaving the factory.
Transparent Progress
Real-time production tracking with clear visibility of every stage.
Cloud Supervisor
Push photos/videos at key milestones to monitor production remotely
Peace of mind on delivery
Doorstep delivery with professional team on-site handover for a worry-free experience.
Standard Production Process
Five clear, fully controllable stages.
Click to expand and view checkpoints and deliverables for each phase
Confirm Configuration
1-2 daysVerify the optional configuration, confirm the chassis model, body specifications, and total price.
Factory scheduling retrofit
30-45 daysOrder Pushing Factory, Production Schedule Planning, Chassis Assembly and Body Modification
Final Vehicle Inspection
3-5 daysFull Vehicle Function Test, Road Validation, Quality Acceptance
Flatbed truck logistics
3-7 daysProfessional car hauling with full GPS tracking and secure delivery to your destination city.
Downstairs vehicle inspection
1 daysDoor-to-door delivery, vehicle inspection at your doorstep, key handover, and usage guidance.
200+ Factory Tests
Five-system comprehensive inspection ensures every vehicle is reliable.
Cloud Supervisor
Photo and video updates at key milestones—track your vehicle's production progress from home.

Chassis Model Confirmation - Iveco Daily Chassis Arrival
2025-01-15

Frame welding complete – Body skeleton assembly
2025-02-08

Electrical and Plumbing Wiring Installation - All Vehicle Wiring Completed
2025-02-20

Interior paneling complete - Cabin interior finishing
2025-03-05

Full-load road test of 100 km - Performance verification test
2025-03-12

Rain Test - Waterproof Seal Verification
2025-03-14

Flatbed Loading & Shipping – Professional Secure Transport
2025-03-18

Client Acceptance Delivery - Feature Demo & Key Handover
2025-03-22
Production Status Inquiry
Enter order number and reserved phone number to track production status in real time.
Sample Order ID: DXL-2024-001 / DXL-2024-002 / DXL-2024-003
Delivered Cases
Every unit is a testament to trust and quality.

Yutong C533 Luxury Dual Slide-Out
Iveco Daily Chassis / Dual Expansion / Lithium Battery 800Ah

DedE Tu PRO MAX
Imported Iveco New Daily / Carbon Fiber Body

Qixing Frontier 2024 Edition
Dongfeng MS6 00 Chassis / Off-Road Modification / Solar 600W

SAIC Maxus Life Home V100
V100 Chassis / Dual Tuo Shan Ju Edition / 6-Passenger Family
Frequently Asked Questions
Production delivery: What you might want to know
Production lead time varies by configuration complexity, typically 30-60 days. Simple modifications take about 30 days; deep customization may require 45-60 days. An exact delivery date will be provided at checkout based on your specific configuration.
Start AI Smart Configuration
After configuration is complete, the production scheduling process starts automatically with full online visibility and tracking.